Skip to content
Readymix Concrete, ready-mix concrete supplier in Dubai

Urgent order? Call: +971 52 998 9988

Ready mix concrete in Al Quoz, a short run from our plant

Our batching plant is in Al Quoz Industrial Area, about 1 km from the centre of the district. For warehouses, workshops and showrooms here, that short haul changes what you can plan.

From our Al Quoz plant
about 1 km in a straight line
Ground conditions
Inland urban plots
Main truck access
Al Khail Road, Sheikh Zayed Road

Industrial floors take the abuse

A warehouse slab in Al Quoz carries forklifts, racking point loads and pallet traffic every day. The floor fails at the surface and at the joints long before it fails structurally. Fibre-reinforced concrete reduces plastic shrinkage cracking and helps the surface hold up at joint edges. Whether it also replaces mesh or bars is a structural design decision.

Flatness depends on steady supply. A large floor bay is poured and finished in one session, and every truck has to arrive at a consistent slump so the power floats work evenly. With the plant this close, gaps between trucks stay short.

Footings, machine bases, accommodation blocks

Workshops need isolated bases for heavy machines, poured with a superstructure-grade mix and sometimes with anchor bolt sleeves cast in. Showrooms and labour accommodation blocks are low-rise frames: pad footings on blinding, ground beams, slabs and columns. Al Quoz is inland, and buried elements here face milder groundwater than coastal districts, but the soil report and your consultant still set the exposure class for the substructure mix.

Screed is a regular order for levelling showroom and office floors before tiles or resin.

Labour accommodation blocks are often repeated designs, which makes a fixed mix for every floor practical and keeps strength results consistent across buildings.

Heat on open slabs

Large roofs and yards in Al Quoz are exposed to direct sun and wind. Fresh concrete loses water from the surface faster than bleed water replaces it, and that is when plastic shrinkage cracks appear. Start in the early morning or at night, have curing compound or wet covering ready before the first truck, and keep it on. Al Khail Road and Sheikh Zayed Road carry heavy traffic at peak times even over a short distance, so the retarder is still set for the slot.

Questions from Al Quoz sites

Does being close to the plant help a floor pour?
Short haul means shorter gaps between trucks and more consistent slump on arrival, which helps the finishing crew.
What mix suits a warehouse slab?
Often a fibre-reinforced mix, with joint layout and reinforcement set by your engineer.

Book a pour in Al Quoz

Tell us the mix, the volume and the pour window. We come back the same working day.

Or give us a call at

+971 52 998 9988
WhatsApp us