Skip to content
Readymix Concrete, ready-mix concrete supplier in Dubai

Urgent order? Call: +971 52 998 9988

Concrete supply in Business Bay, beside the Water Canal

Business Bay basements go deep on narrow plots next to the canal. Before the raft, there is usually a shoring wall to hold back wet ground, and that wall is concrete too.

From our Al Quoz plant
about 8 km in a straight line
Ground conditions
Coastal, shallow saline groundwater
Main truck access
Al Khail Road, Al Asayel Street

Shoring first

Plots here are tight, and neighbours stand right at the boundary. Deep excavation needs a retaining system: secant piles, contiguous piles or a diaphragm wall, often with sprayed concrete facing between piles. Our shoring mix is designed for those secant and contiguous piles, and gunite covers sprayed facing where the design calls for it.

The canal keeps the groundwater shallow and saline. Even temporary shoring sees that water, and where the shoring becomes part of the permanent basement wall, it needs the durability of a substructure element. Your consultant decides which applies.

Under the raft and above it

Bored piles and the raft take piling and substructure mixes on GGBS at a low water/cement ratio, against chlorides and sulphates. Basement walls cast against the shoring are hard to inspect later, so getting cover and compaction right on the day matters more than usual.

Office and residential frames above move to a superstructure mix. Transfer slabs at podium level carry the tower columns over open floor plans below. They are thick, heavily reinforced and poured in one go, which calls for a mix that flows through congested steel and a pour plan that keeps the face live.

Getting into a plot

The plant is about 8 km from Business Bay in a straight line, via Al Khail Road or Al Asayel Street. Trucks often queue on a service road with no space to wait, so we stagger dispatch to the pump's rate. Peak traffic changes arrival times; the retarder covers that. Building and community management set delivery hours, so check with them, and expect summer pours to run at night under placing-temperature limits.

Questions from Business Bay sites

What mix do secant piles need in Business Bay?
A shoring mix designed for the pile sequence. Where shoring forms part of the permanent wall, your consultant may require substructure durability.
Can you supply sprayed concrete for shoring faces?
Yes, gunite is part of our range for sprayed facing between piles.
How do you handle trucks on a tight plot?
We stagger dispatch to match the pump rate so trucks do not wait on the road.

Book a pour in Business Bay

Tell us the mix, the volume and the pour window. We come back the same working day.

Or give us a call at

+971 52 998 9988
WhatsApp us