Dubailand concrete supply for early-phase masterplans

In Dubailand the work is mostly at ground level: footings, ground beams and first slabs for large villa and townhouse masterplans on open desert. That is where wind and sun do the most damage to fresh concrete.

From our Al Quoz plant
about 13 km in a straight line
Ground conditions
Open desert sand, deeper water table
Main truck access
Sheikh Mohammed Bin Zayed Road, Al Ain Road

What open desert does to a fresh slab

A slab placed on an exposed plot loses surface water to wind and sun faster than bleed water can replace it. The result is plastic shrinkage cracking, short random cracks that appear within hours. They are a curing problem first and a mix problem second.

We help on the mix side: a slump target set for the hour of the pour, a retarder dose for the trip, and fibre-reinforced concrete where the specification allows it on slabs on grade. The site team has to do the rest, with windbreaks if needed, curing compound as soon as finishing ends, and wet curing for the days the specification asks.

Footings and ground beams in sand

Desert sand drains well, and deep groundwater is not usually the governing exposure inland. Footings here are sized for bearing and settlement. We pour blinding first, then the substructure mix for pads, strips and ground beams.

Masterplans pour the same footing many times. A batch of 36 m³ for a row of villa pads is exactly three trucks, and keeping the mix design fixed across the phase helps the consultant read cube results as a trend.

Where infrastructure goes in before the houses, such as manholes, culvert bases and service trench surrounds, blinding and the substructure mix cover most of it. Fill those trenches before the wind fills them with sand.

Distance and timing

Dubailand sits about 13 km from our Al Quoz plant in a straight line, reached by Sheikh Mohammed Bin Zayed Road or Al Ain Road. Peak traffic adds time, so summer pours are best booked for the night or early morning, and the retarder covers travel plus any wait at the gate. The master developer usually sets site access and delivery routes, so confirm those before the first truck.

Questions from Dubailand sites

Why do my slabs crack before the next morning?
On an open site this is usually plastic shrinkage from wind and sun. Start curing earlier, pour in cooler hours, and consider a fibre-reinforced mix for slabs on grade.
Can you keep up with several crews pouring footings the same day?
Give us the pour list for the day with volumes and locations. We plan trucks and pumps across them and tell you if a sequence needs to move.
How far is Dubailand from your plant?
About 13 km in a straight line from Al Quoz. The page shows the distance; travel time depends on traffic and the route the developer allows.