Ready mix in Al Furjan and Discovery Gardens: footings to roof

Al Furjan and Discovery Gardens are townhouses, villas and low-rise apartments on open ground near Sheikh Mohammed Bin Zayed Road. Lots of slabs exposed to the sun, and a 13 km haul from Al Quoz.

From our Al Quoz plant
about 13 km in a straight line
Ground conditions
Inland urban plots
Main truck access
Sheikh Mohammed Bin Zayed Road, Sheikh Zayed Road

Low-rise, done properly

Townhouses and villas here usually sit on pad or strip footings with ground beams, poured on a blinding layer. The ground is inland and the exposure class comes from the soil report; the substructure mix is designed to it. Low-rise apartment blocks may add a basement and a raft.

Above ground, columns and slabs take a superstructure mix. Roof slabs on these buildings are thin and wide, the worst shape for drying out in the sun.

With many repeated townhouse units, the same mix is often used for every footing and every slab on the project. That repetition is useful: strength results stay comparable from unit to unit, and any drift in a delivery shows up quickly.

Plastic shrinkage on open plots

The area is flat and open to wind. A fresh roof or ground slab exposed to sun and wind loses water from the surface faster than it bleeds, and fine cracks appear before the concrete has set. They let water and salts in later. The cure is procedural: pour at night or early morning, keep evaporation down with windbreaks or fog spray if your contractor uses them, apply curing compound or wet covering as soon as finishing ends, and keep it for the period your engineer specifies.

Fibre-reinforced concrete helps on external slabs, driveways and boundary walls, though it does not replace curing.

A longer run from the plant

At about 13 km in a straight line, this is one of the further points we serve in the west. Trucks reach the area by Sheikh Zayed Road and Sheikh Mohammed Bin Zayed Road, and peak traffic lengthens the trip, so the retarder is dosed for a longer drum time and slump is targeted at arrival. Community management and developers set delivery hours and routes inside the communities; check with them before fixing a pour.

Questions from Al Furjan and Discovery Gardens sites

Why do roof slabs crack in Al Furjan?
Wide, thin slabs on an open site dry fast in sun and wind. Early pours and immediate curing are the main defence.
Does the distance from Al Quoz affect the concrete?
It means more time in the drum. We set the retarder dose for the expected travel so workability holds until placing.

Book a pour in Al Furjan and Discovery Gardens